Net feeding
Sabse popular- Export-import ka hisab ek hi meter me
- 100 unit bheja, 80 liya = bill 0, 20 unit credit
Loading products from the store…
Commercial plants range from about 10 kW to 200 kW. We pick the right metering model for your connection: net feeding, gross metering, zero export or hybrid.
You get an original GST bill, and businesses may be able to claim depreciation. Please confirm the tax benefit with your CA.
Daytime loads run on solar, which brings the monthly bill down.
A proper tax invoice, and possible depreciation benefit (confirm with your CA).
Net feeding, gross, zero export or hybrid, chosen for your approval and load.
Maintenance and audit packages are available after installation.
Commercial me 5 tarah ke system. TopCon 615W+ panel, 30 saal performance warranty. GST aur depreciation ka fayda (apne CA se confirm karein).
Loading products from the store…
Loading products from the store…
| Type | Metering | Approval | Bachat | Kiske liye |
|---|---|---|---|---|
| Net feeding | Bidirectional | 15–20 din | 80–90% | Dukaan / office |
| Gross | 2 meter | 15 din | 40–50% | Purani policy |
| Zero export | No export | Nahi — 2 din | 60–70% | Fast install |
| Hybrid | Net feeding + battery | 15 din | 80% + backup | Hospital / hotel |
| Off-Grid | No grid | Nahi | Independent | Remote site |
Commercial aur industrial solar par sarkari subsidy nahi hai — subsidy sirf Residential On-Grid / Hybrid me 1–30 kW par ₹1.08 lakh tak* (Kendra + UP Rajya). *Sarkari niyam ke hisab se badal sakti hai.
The home scheme does not apply to commercial plants. The benefits are lower power cost and possible depreciation.
Most shops and offices choose net feeding. If approval is slow, zero export is a fast option. We advise after seeing your meter and bill.
Check price and packages in the store, fill the form, or message us on WhatsApp.
Naam aur number dein — hamari team call karegi.