Installation & Shifting
New installation and plant shifting
New installation: we survey your roof, design the layout, fix a strong structure, install panels and inverter, do wiring and earthing, and help with net metering paperwork.
Plant shifting: if you are moving house or shop, or changing the roof, we carefully take the plant down, move it, and set it up again with testing.
From survey to a running plant
- 1
Site survey
Roof size, shadow, load and meter are checked.
- 2
Design and quote
Layout, plant size and a clear written quote.
- 3
Structure and panels
A strong structure is fixed and panels are mounted.
- 4
Wiring, earthing, inverter
DC and AC wiring, protection devices and earthing are done to standard.
- 5
Net meter and handover
We help with the net meter process, test the plant, and show you how to monitor it.
Moving an existing plant
- 1
Check the old plant
We note the condition, ratings and layout before touching anything.
- 2
Careful removal
Panels, inverter and structure are taken down and packed to avoid damage.
- 3
Transport
Moved to the new place with care.
- 4
Reinstall and test
Fixed again, wired, earthed and tested, with net meter help if needed.
Installation questions
?Do you handle the net meter paperwork?
We guide and help with the documents. Approval itself is given by the electricity department, so its timing is theirs.
?Can an old plant from another company be shifted?
Usually yes, after a quick check of its condition. We tell you in advance if something needs repair.
Ready to go ahead?
Check price and packages in the store, fill the form, or message us on WhatsApp.